Edit Template

How Long Does a Double Storey Extension Take?

Homeowners across Mornington Peninsula and Mount Eliza often ask how long renovation projects take before deciding to proceed.

The timeline for double storey house extensions depends on several stages including design, approvals, and construction.

While every project is different, understanding the typical timeline helps homeowners plan more effectively.

Planning and Design Stage

Before construction begins, a detailed planning phase is required.

This stage typically includes:

  • architectural design development
  • site measurements and surveys
  • structural engineering assessments
  • project budgeting
  • permit applications

For most projects, the design and planning phase takes approximately:

6–12 weeks

More complex architectural projects may take longer, particularly if multiple design revisions are required.

Council Approvals

Depending on the project, building permits and planning permits may be required before construction begins.

Approval timelines vary depending on the project and council workload.

Typical timeframes may include:

Approval TypeTypical Timeline
Building Permit2–4 weeks
Planning Permit (if required)4–12 weeks

Some projects in the Mornington Peninsula Shire may also require additional assessments if planning overlays apply.

Construction Timeline

Once permits are approved and construction begins, the build process typically takes several months.

Typical construction stages include:

1. Site preparation

  • scaffolding installation
  • structural preparation
  • protection of existing areas

2. Structural framing

  • removal of existing roof
  • installation of structural supports
  • building the second storey frame

3. Roofing and exterior works

  • roof installation
  • exterior cladding
  • window installation

4. Interior construction

  • electrical and plumbing work
  • plastering and insulation
  • stair installation

5. Finishing and fit-out

  • flooring
  • painting
  • cabinetry and joinery
  • bathroom installation

For most projects, the construction stage typically lasts:

16–26 weeks (4–6 months)

More complex renovations or larger second storey additions may take longer.

Total Project Timeline

When combining all stages, a typical double storey extension timeline may look like this:

StageEstimated Duration
Design & planning6–12 weeks
Approvals2–12 weeks
Construction16–26 weeks

Total timeline: 6–9 months on average

Projects involving extensive structural upgrades or architectural complexity may extend beyond this timeframe.

Planning for a Smooth Renovation

Working with experienced professionals can significantly reduce delays and help ensure the project runs efficiently.

Experienced builders and designers help manage:

  • permits and approvals
  • engineering requirements
  • construction scheduling
  • coordination of trades

This ensures double storey house extensions progress smoothly from concept to completion.

Start Planning Your Extension

If you’re planning double storey house extensions in Mornington Peninsula or Mount Eliza, explore renovation solutions designed to deliver a smooth construction process.

👉 https://alternatevision.com.au/double-storey-house-extensions/

At Alternate Vision, we don’t just build houses - we create homes. A house is made of bricks and beams, but a home is built from dreams, personality, and purpose - that’s what makes it unique and yours - that’s what makes it an alternate vision. No templates, no shortcuts—just a custom space that feels like yours from the moment you walk in.

Usual operating hours are

Get in touch

Phone Number

0414 536134

Email

nathan@alternatevision.com.au

Address

86 Walkers Rd, Mount Eliza VIC 3930

© 2025 All Rights Reserved to Alternate Vision